High throughput, low cost, fully pipelined architecture for AES crypto chip
… , 2006 Annual IEEE, 2006
Reprogrammable devices such as field programmable gate arrays (FPGA's) are highly attractive... more Reprogrammable devices such as field programmable gate arrays (FPGA's) are highly attractive options for hardware implementations of encryption algorithms. This paper proposes compact, memory less, high-speed hardware architectures for the Rijndael AES encryptor/decryptor, with combined data path, resource sharing and logic optimization for novel networking applications. Architectural optimization exploits the strength of pipelining, loop unrolling and sub-pipelining. Speed is increased
Uploads
Papers by Richa Sharma